Login

Planning Matters

***************************************************************************************

Find out here about: your Village Design Statement, the North Northamptonshire Joint Core Strategy(including planned strategy for our side of Corby), the East Northamptonshire Greenway (in the Nene Valley from Northampton to Peterborough), and larger local planning applications.

To look up planning applications search number (eg.15/01318/VAR) or location (eg.'Pilton') or postcode at View Planning Applications (http://www.east-northamptonshire.gov.uk/viewplanningapplications).

***************************************************************************************

06 Nov 2017 - 17/02298/FUL | Complete refurbishment of Grade II Listed Building including internal alterations, new external openings, single storey conservatory extension, and new first floor structures at roof level - (consequential to consent 16/02413/FUL) | Wadenhoe House Church Street Wadenhoe Northamptonshire PE8 5SR [respond by 29 Nov]

***************************************************************************************

24 Oct 2017 - 17/02088/FUL - Conversion of loft to two habitable rooms, installation of 1 rooflight to West Elevation and 2 rooflights and 1 window to East Elevation at 1 Old Farm Oundle Road Stoke Doyle Peterborough Northamptonshire PE8 5TB [respond by 14 Nov]

***************************************************************************************

16 Oct 2017 - 17/02200/TCA - T1 - Beech, infected with Phytophthora. Fell to ground level at Manor Farm House Main Street Wadenhoe Peterborough Northamptonshire PE8 5SX [respond by 6 Nov]

***************************************************************************************

02 Oct 2017 - 17/02064/TCA - TG1 - Walnuts - formative prune, crown lift to 2.1m at The Green,  Wadenhoe. [Granted, 31/10/17; actioned 1/11/17]

***************************************************************************************

23 Aug 2017 - 17/01791/TCA/ | T1 - Laburnum. Rot in main union, reduce by 2m T2 - Beech. Crown lift to 2m and reduce by 2.5m. T3 - Silver birch crown lift to 2m and reduce by 2m on east to shape crown. T4 - Cherry.remove 2 lower branches | Home Farm House Main Street Wadenhoe Peterborough Northamptonshire PE8 5SX. [Granted, 22/9/17]

***************************************************************************************

16 Aug 2017 - 17/01730/FUL | Removal of fence and construction of stone wall to fill gap. New stone wall and timber fence. Remove sycamore tree and form car parking spaces for South Lodge. | Wadenhoe House Church Street Wadenhoe Northamptonshire PE8 5SR (& 17/01731/LBC). [Refused, 9/10/17].

***************************************************************************************

2 Aug 2017[Amended 2 Oct] - 17/01397/FUL | Change of use for existing ancillary habitable accommodation to Wadenhoe House from C1 Wedding and Conference use, to C1 Dwellinghouse, to create 3No. independent dwellings. | Wadenhoe House Church Street Wadenhoe Northamptonshire PE8 5SR. [Granted, with conditions, 06/11/17]

***************************************************************************************

31 Jul 2017 - 17/01257/FUL | Change of use from ancilliary storage to ancilliary office accommodation (was to be residential) of existing barn. Single storey extention to existing barn. | Elmes House Main Street Pilton Peterborough Northamptonshire PE8 5SN [Granted, with conditions, 21/8/17]

***************************************************************************************

24 Jul 2017 - 17/01489/FUL | Erection of stone wall | Wadenhoe House Church Street Wadenhoe Northamptonshire PE8 5SR[separates kitchen garden from Wadenhoe Ho](&17/01620/LBC) [Refused 14/9/17]

***************************************************************************************

14 Jul 2017 - 17/01467/TCA/ | T1 - Twisted Hazel tree to fell due to tree having died; due to location (excessive shading) replanting is not recommended . T2 - Hawthorn tree has dead limb which has died and needs removing; remainder of tree will stay. | 2 Mill Lane Wadenhoe Peterborough Northamptonshire PE8 5XD

***************************************************************************************

13 Jul 2017 - 17/01444/FUL | Change of use into a single dwelling C3 from ancillary accommodation part of wedding and conference centre C1 and part agricultural | North Lodge Pilton Road Wadenhoe Northamptonshire PE8 5SU [Application included shared vehicular access to rear, and boundary adjustment][Granted, with conditions, 4/9/17]

***************************************************************************************

4 Jul 2017 - 17/01332/FUL | Proposed alterations and widening of existing access to dwelling | The Mill House Wadenhoe Road Stoke Doyle Northamptonshire PE8 5TG

***************************************************************************************

28 Jun 2017 - 17/01257/FUL | Change of use from ancilliary storage to ancilliary residential of existing barn. Single storey extention to existing barn. | Elmes House Main Street Pilton Peterborough Northamptonshire PE8 5SN

***************************************************************************************

21 Jun 2017 - 17/01296/AMD | Non material amendment : To improve the resistance to attack by unknown persons to the glazed windows in the generator hut. Omit window in south west elevation and add safety rail to Maintenance Deck - pursuant to planning permission 15/01861/FUL - dated 08.02.16. Installation of a hydropower generation scheme, a channel from the Mill Leat to the scheme plus hut to cover generator, gearbox and control system. | Land Next To River Nene Wadenhoe Church Street Wadenhoe Northamptonshire [Permitted 17 Jul 2017]

***************************************************************************************

25 May 2017 - 17/00982/FUL | Change of use of part of site from C1 to C3. Form new vehicle access with timber gate and posts from Pilton Road. Form access drive and parking spaces for existing dwelling. Remove gates and posts and block up existing vehicle access from Pilton Road. | Land Rear Of 24 Pilton Road Wadenhoe Northamptonshire. See also 17/00983/LBC. [Refused 17/8/17]

***************************************************************************************

9 May 2017 - 17/00940/FUL | Single storey rear extension | 1 Pilton Lodge Cottages Lodge Road Pilton Peterborough Northamptonshire PE8 5TD

***************************************************************************************

12 Apr 2017 - 17/00671/FUL | Replacement of flat roof extension and garden room with single storey extension to east elevation; Erection of first floor extension over existing garage and new garage door arrangement; Replacement of windows; New shed and greenhouse; and Reposition of oil tank | Ivy House Main Street Pilton Peterborough Northamptonshire PE8 5SN [Granted 01/06/17]

***************************************************************************************

28 Mar 2017 - 17/00618/FUL | Minor repairs to the East Window, replacement of 6 quarries in the North aisle north facing window, and for the installation of externally ventilated glazing to the major East Creation Window, 3 x Chancel windows and the South aisle East window | St Mary And All Saints Church Main Street Pilton Peterborough Northamptonshire PE8 5SN [Granted 17/05/17]

***************************************************************************************

09 Mar 2017 - 17/00490/FUL | New front ashlar stone Porch (Portico) and rear painted timber and ashlar stone conservatory | The Mill House Wadenhoe Road Stoke Doyle Northamptonshire PE8 5TG [Retrospective,  work started 17/11/16; Granted 28/04/17]

***************************************************************************************

08 Mar 2017 - 17/00447/FUL | Alterations and extension to dwelling (resubmission of 16/02235/FUL) | The Chestnuts Main Street Pilton Peterborough Northamptonshire PE8 5SN [Granted 18/04/17]

***************************************************************************************

08 Mar 2017 - 17/00417/FUL & 17/00418/LBC | First Floor Side Extension & Internal Alterations | The Coach House Main Street Pilton Peterborough Northamptonshire PE8 5SN [Granted 24/04/17]

***************************************************************************************

02 Mar 2017 - 17/00443/LBC | Removal of floor tiles in kitchen and living room and replace with new following water damage | 33 Church Street Wadenhoe Peterborough Northamptonshire PE8 5ST [Granted 18/04/17]

***************************************************************************************

23 Jan 2017 - 17/00138/TCA/ : To fell two leylandii screening an electricity pole to facilitate removal of the electricity pole. Due to the number of other large trees already in the garden it is proposed to review what trees to replant as replacement trees, if any, once all felling has been completed at Ivy House Main Street Pilton Peterborough Northamptonshire PE8 5SN.

***************************************************************************************

20 Dec 2016 - 16/02403/TPO/ | TPO Order no 14 1) TPO G26 - to fell two Scots Pines due to proximity to stone boundary wall (c20cm) and to avoid potential damage to stone wall. | Ivy House Main Street Pilton Peterborough Northamptonshire PE8 5SN [Granted 20/02/17]

***************************************************************************************

19 Dec 2016 - 16/02454/TCA/ | To fell two leylandii | Ivy House Main Street Pilton Peterborough Northamptonshire PE8 5SN [Allowed 23/05/17]

***************************************************************************************

15 Dec 2016 - 16/02413/FUL: Change of use from C1 wedding and conference centre to C3 dwellinghouse.  Wadenhoe House Church Street Wadenhoe Northamptonshire PE8 5SR. [Granted with conditions 14/02/17]

***************************************************************************************

13 Dec 2016 - 16/02392/FUL: Change of use of part of site from C1 to C3. Reinstatement of existing vehicle access including the removal of existing gates and the formation of an access drive with car parking and turning area. 24 Pilton Road Wadenhoe Northamptonshire PE8 5SU. Planning application 16/02393/LBC also relates. [APPLICATION WITHDRAWN 13th Feb 2017]

***************************************************************************************

24 Nov 2016 - 16/02235/FUL: Alterations and extension to dwelling at The Chestnuts Main Street Pilton PE8 5SN. Planning application 16/02236/LBC also relates. [Both Refused 09/01/17]

***************************************************************************************

17 Aug 2016 - 16/01593/FUL - Replace existing septic tank at The Chestnuts Main Street Pilton Peterborough Northamptonshire PE8 5SN. [Granted 12/10/16]

***************************************************************************************

21 Jul 2016 - 16/01429/VAR - Change to condition 2 (plans) pursuant to application 13/00966/FUL : Redevelopment comprising conversion of traditional farm building to form four residential units plus one additional new build residential unit and accompanying removal of modern agricultural buildings. How Hill Farm Oundle Road Stoke Doyle Peterborough Northamptonshire PE8 5TJ [Permitted 06/10/16 subject to conditions].

***************************************************************************************

3 Jun 2016 - 16/01042/TPO Planning application relating to works on various trees near Pilton crossroads. [Permitted 16/08/16]

***************************************************************************************

8 Apr 2016 - 16/00596/FUL & 16/00467/LBC Erection of two storey side extension; alteration of internal ground floor stud walls to create enlarged sitting room and new WC at The Chestnuts Main Street Pilton Peterborough Northamptonshire PE8 5SN. [Permitted 26/07/16]

***************************************************************************************

8 Mar 2016 - 16/00439/PNT | Installation of a 15 metre lattice mast topped with two dipole antennas(height to top of antennas 17.8m) a 600mm diameter dish attached to mast at 14.5m to centre of dish along with a 1.6m x 2.6m equipment cabin and development ancillary thereto including meter cabinet, 2 GPS antennas attached to proposed cabin and overhead cable gantry on poles all within a 2.4m high palisade fenced enclosure | Communication Mast Stoke Doyle Road Oundle Northamptonshire. [Prior Notification Applicn.]

***************************************************************************************

3 Mar 2016 - 16/00400/TCA/ | TG1 - Crown lift to 2.7m to group of 10 lime trees T2 - reduce limb with inclusion by up to 1.5m | Pilton Manor Main Street Pilton Peterborough Northamptonshire PE8 5SN [Permitted 4/4/16]

***************************************************************************************

Pilton, Stoke Doyle and Wadenhoe Village Design Statement is now a statutory Supplementary Planning Document.

On 22 February 2016 the Pilton, Stoke Doyle and Wadenhoe Village Design Statement was adopted by East Northamptonshire Council as a statutory Supplementary Planning Document.

It was prepared by a locally appointed Village Design Statement (VDS) group led by Pilton, Stoke Doyle and Wadenhoe Parish Council.  The VDS was prepared over a two year period, and submitted to East Northamptonshire Council in April 2015. The VDS places an emphasis to “ensure that the unique visual character of our villages remain intact”.

In July 2015 East Northamptonshire Council approved the draft VDS for consultation, with a view to adopting the Pilton, Stoke Doyle and Wadenhoe Village Design Statement as a statutory Supplementary Planning Document (SPD). This consultation took place over 6 weeks (17 August - 28 September 2015, inclusive). 

In accordance with Part 4 of the Town and Country Planning (Local Planning) (England) Regulations 2012 (Statutory Instrument 2012 No. 767), as amended, the Pilton, Stoke Doyle and Wadenhoe VDS was adopted by the Council as a statutory SPD on 22 February 2016.

The Pilton, Stoke Doyle and Wadenhoe VDS, is now a statutory Local Development Document and supplements the statutory Local Plan for East Northamptonshire, covering the Parish areas of Pilton, Stoke Doyle and Wadenhoe. The VDS sets out detailed design principles, to provide information to developers and others on the three village areas and to try to encompass the character of the villages and the people so that designs made for changes and additions, large and small, can be made sympathetically.  Now adopted, it will supplement relevant development management policies within the East Northamptonshire Local Plan and is now a material consideration for determining planning applications within the Parishes of Pilton, Stoke Doyle and Wadenhoe.

See Village Design Statement.

[Note: we cannot put the actual VDS document on this website as it is 6221kb and this website's document size limit is 500kb, but you can easily download it from ENC's website to your computer]

***************************************************************************************

20 February 2016 - 16/00262/TCA. Removal of conifer trees that surround property at The Chestnuts, Main Street, Pilton, Northamptonshire PE8 5SN. [Granted with notes, 31 March 2016]

***************************************************************************************

12 February 2016 - 16/00142/FUL Replace existing Collyweston slate roof to redundant agricultural building with concrete interlocking tiles maintaining existing roof line and pitch at Manor House, Wadenhoe Road, Stoke Doyle, Northamptonshire PE8 5TG. [Granted with conditions, 5th April 2016]

***************************************************************************************

2 Dec 2015 - 15/02126/FUL - Proposed first floor extension, over the existing garage to include dormer to front elevation at Holly House Church Street Wadenhoe Northamptonshire PE8 5ST [Permitted]

***************************************************************************************

3 Nov 2015 - 15/01970/FUL & 15/01998/LBC - Conversion of three barns into four dwellings at Dovecote,  Pilton Road, Wadenhoe, Northamptonshire by Wadenhoe Trust [Granted with conditions, 7th January 2016]

***************************************************************************************

13 Oct 2015 - 15/01861/FUL Installation of a hydropower generation scheme, a channel from the Mill Leat to the scheme plus hut to cover generator, gearbox and control system at Land Next To River Nene Wadenhoe Church Street  Wadenhoe Northamptonshire. [Previous application 11/00925/FUL permitted in 2011, with conditions, has expired] [Permitted with conditions]

***************************************************************************************

7 Oct 2015 - 15/01798/FUL- Erection of non habitable storage shed on paddock land at Paddock Barn, 1A Mill Lane, Wadenhoe, Northamptonshire PE8 5XD. [Granted with conditions, 23/11/15]

***************************************************************************************

17 Aug 2015 - Draft Village Design Statement Published for Consultation until 28th September 2015.

In April 2015 Pilton, Stoke Doyle and Wadenhoe Parish Council submitted the draft Pilton, Stoke Doyle and Wadenhoe VDS to East Northamptonshire Council, with a view to its being adopted by the local planning authority as a statutory Supplementary Planning Document (SPD), in accordance with the Town and Country Planning (Local Planning) (England) Regulations 2012 (“the Regulations”), as amended. On 20 July 2015, East Northamptonshire Council’s Planning Policy Committee approved the draft VDS for consultation.

In accordance with Regulations 12 and 35, the draft VDS is now published for consultation. The draft VDS and other supporting documents are available on the Council’s website at the following link:

http://www.east-northamptonshire.gov.uk/consultation.

[More directly you can either cut and paste: http://www.east-northamptonshire.gov.uk/downloads/file/8568/pilton_stoke_doyle_and_wadenhoe_village_design_statement_supplementary_planning_document_%E2%80%93_consultation_draft_august_2015   OR  click on it on 'Useful Links' page]

You can also inspect these documents, from Monday, 17 August 2015, at:

Customer Service Centre, Cedar Drive, Thrapston, NN14 4LZ (8:45am-5pm, Monday to Friday)
Customer Service Centre, Newton Road, Rushden, NN10 0PT (9am-4:30pm, Monday to Friday)
Customer Service Centre, Oundle Library, Glapthorn Road, Oundle, PE8 4JA (10am-1pm, Monday to Saturday)
Thrapston Library (opening times and other details are available from Northamptonshire County Council)

Any representations concerning the draft Pilton, Stoke Doyle and Wadenhoe VDS should be made in writing to: Planning Policy and Conservation, East Northamptonshire Council, Cedar Drive, Thrapston, Kettering, NN14 4LZ; or by e-mail to planningpolicy@east-northamptonshire.gov.uk, no later than 4.00pm on Monday, 28 September 2015.

{NOTE: There is an official ENC Public Notice for this on page 11 of 15th August 2015 edition of 'Nene Valley News', along with an article about it on page 2. For 'Nene Valley News' e-versions see 'Useful Links' page}.

***************************************************************************************

4 Aug 2015 - 15/01462/FUL | The construction of two off street car parking areas for use by residents of the adjacent cottages and the provision of an improved vehicle access to one of the car parks | 1 The Green Wadenhoe Peterborough Northamptonshire PE8 5SY. [Withdrawn / Declined 8 Sep 2015]

***************************************************************************************

Of local interest - Spring 2015 - 15/00638/EXT | Proposed residential development for 269 dwellings, car parking, landscaping and associated infrastructure | Land At Weldon Park Oundle Road Weldon Northamptonshire [Permitted]

***************************************************************************************

6th February 2015 - North Northamptonshire Joint Core Strategy 2011-2031 Pre-Submission Plan

The North Northamptonshire Joint Core Strategy (JCS) is the strategic Part 1 Local Plan for Corby, East Northamptonshire, Kettering and Wellingborough. It outlines a big picture to be developed in more detail through the Part 2 Local Plans prepared by the District and Borough Councils and by Neighbourhood Plans prepared by Neighbourhood Planning Groups. The JCS is prepared by the Joint Planning Unit (JPU), reporting to the North Northamptonshire Joint Committee made up of elected representatives from the District, Borough and County Councils.

See http://www.nnjpu.org.uk/publications/docdetail.asp?docid=1458

***************************************************************************************

Jan 2015 - East Northamptonshire Greenway Forward Plan 2014-18

The East Northamptonshire Greenway makes attractive and safer walking and cycling routes available in the heart of the Nene Valley. The Greenway is being developed in phases, some of which are already completed and others will follow within the next few years. The Greenway Vision map illustrates how it looks now and how it might look in the future. The Greenway will help connect East Northamptonshire’s communities to a central route that will run from Wellingborough Railway Station in the south and to Peterborough railway station in the north and vice-versa. It will link open spaces together with opportunities for informal recreation and alternative means of transport to services and facilities. The project will also provide safe routes for young people who walk and cycle to school. The Greenway Forward Plan sets out how it will develop over the next few years. It is a vital tool for both the development and management of the Greenway and the work of the Greenway Board. The document covers:

  • details of routes completed so far and what the costs were to build those phases and 
  • future routes set out as phases with indicative costings, maintenance requirements and any special issues.

The plan illustrates how the Greenway links to other national organisations’ routes (e.g. Sustrans) and to other surrounding cycle route projects (e.g. The Welland Valley Cycleway), as well as providing information for local communities who wish to link their own projects to the Greenway. It also illustrates how the Greenway supports countywide tourism and provides opportunities for the development of rural tourism businesses, in particular in the context of Northamptonshire Enterprise Partnership’s Destination Nene Valley tourism project for the county.

See http://www.east-northamptonshire.gov.uk/info/200096/tourism_and_travel/786/east_northamptonshire_greenway

***************************************************************************************

22 October 2014 - 14/02057/LBC: Reconstruction of damaged parapet on a like for like basis | Lilford Bridge Pilton Road Lilford Northamptonshire PE8 5SG. [Work to start 19 Oct 2015] [Completed, 13 Nov 2015]

***************************************************************************************

5 Jan 2013 - 13/00966/FUL: Redevelopment comprising conversion of traditional farm building to form four residential units plus one additional new build residential unit and accompanying removal of modern agricultural buildings being repositioning of garage, internal layout changes and resultant window changes | How Hill Farm Oundle Road Stoke Doyle Peterborough Northamptonshire PE8 5TJ [Permitted 17 Jan 2014]

***************************************************************************************